MARCH
Demolition. Two internal walls and a suspended ceiling nobody had looked behind since 1974.
AUGUST
Structure. A steel to take the old wall out, and the roof light framed.
JANUARY
First fix. Services in, plaster on, and the first day it felt like a room.
THE FOLLOWING MARCH
Finished. Same camera position, same lens, twelve months apart.